Skip to content

New Feature Suggestions and Bug Reports

Use this forum to request and vote for new features or bug fixes. For the best results, make sure to check if your feature/bug fix has already been requested before posting a new one. As you type your suggestion here, you will see suggestions which may match yours.

Here is what the statuses mean:

  • Under Review: This has been accepted. The release date is unknown.
  • Planned: This has been planned for an upcoming release – either the next release or very soon after.
  • Started: This is being actively worked on by our staff and will appear in the next major release.
  • Completed: The item has been fully implemented and appears in the latest release.
  • Declined: The item was not accepted. Check the comments area for the reason.

470 results found

  1. Add attachments/link ability

    ToodleDo now allows linking from a task to a selected note. This ability would be very helpful on the Android phone and/or tablet.

    21 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Arrange due time from earliest to latest

    One can arrange (sort) by due date, it does arrange by time, however instead of placing the tasks with time at the top, it is currently being placed at the bottom of the view. It would be nice to have the tasks that I have a due time for the particular day arranged at the top and the ones without the time at the bottom, this way I can immediately focus on the tasks due by time first - enhances my time management as well

    8 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. Filter not just by an exact contact but if the task has a contact

    I sometimes want to know if there is something that I need to do with a group of people. I would like to filter tasks that have a contact. That way I can have a work or church Folder. When I am at work or church I can have a filter that shows me things that I need to do with people at that location.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Use an icon to indicate that a task is shown in the calendar

    Currently, inside Ultimate ToDo, you have to open a task to see if it is shown in the calendar. I suggest you add an icon to the task list for each task shown in the calendar.
    This, combined with the multi edit functionality (existing idea) would be very helpful to easily handle calendar integration.

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. Take advantage of Samsungs split screen option.

    New Samsungs and several other droids, allow screen to be splitted so you could use several apps at the same time on the same screen. Would be great to see calendar and to do list at the same time.

    16 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Show P(arent) icon when subtasks filtered out

    Configure the display to show icons.
    If both a Parent and its Subtask are shown in the view, they are marked with P and S icons, respectively.
    If only the Subtask is shown, it is marked with an S icon and the parent can be reached through the 'parent task' action button in the task view.
    But if only the Parent is shown, there is no P icon and in the task view the 'subtasks' action button is always displayed, even if there are no subtasks (yet). Hence, there is no indication whatsoever subtasks exist.

    Desired resolution:
    - When icons…

    2 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  0 comments  ·  Bug Report  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. allow repeatable tasks to be skipped

    I have a chores list. The items are repeated at various intervals but they are all repeated. Some of these are marked as optional. Some days I know I wont be able to do all of the chores. I can't delete it b/c I want it to show up the next time. I can't check it off as done b/c that would give incorrect statistics w/n the various reports on toodledo website. So, I'd like a "skip this instance" action. It would not mark it done but would hide it from view or maybe delete that instance only w/o affecting…

    9 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Implement Astrid-style continuous reminders

    An option to allow a task to sound its reminder continuously until dismissed/snoozed, like Astrid did, would be very useful.

    I've thought about setting the reminder sound to the one on my phone that loops continuously, or setting a very short 'nagging' time, but this would apply to all tasks. A per-task setting would be most useful as I spend a lot of time driving, so I don't want to be constantly having to dismiss or snooze tasks.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. Add task 'repeat' attribute as a filter criteria for views

    I'd like to be able to have a view showing all due repeating tasks that were not complete so they didn't roll over and become overdue. Without this filter it's not currently possible. I'm sure there are many other uses of having this available as a filter option too.

    16 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. when selecting a priority, display the color of the priority, as well as the name of the priority

    When I look at the task list the priority is displayed as a color. If I wish another task to be the same priority I remember the color. If the priority selection window displayed the color of the priority as well as the name, selection would be easier.

    4 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Quickly add a task from the notification bar

    Many to-do list managers allow quickly adding a task without first opening the program.
    Most of the time, this is done with a one-click option from the notification bar. Tools that include this great feature are 2Do, any.do, ...
    Could you please provide such an option in UTL?
    Thanks!

    11 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. Colour today and future dates in My views

    In my views currently I have such a list:

    Today is 04/10/2013
    Title of the task - Note - Due Date
    Alexander - Task 1 - 02/10/2013 (text colour is red)
    Alexander - Task 2 - 04/10/2013 (text colour is white)
    Alexander - Task 3 - 10/10/2013 (text colour is white)

    It could be easire to understand if the Date Due colour for today was yellow or green (different from the one that are already passed and from those that haven't come yet).
    It would be even better if I could put my own colours for today, 3 day before…

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Insert a separator after sort by in the sort order in the My views

    Having lots of tasks with the same name (I use people as Tasks) - that's how I track if I've done all my work with one of them. When I have all of them in the view it would be nice to have them all separated one from each other.

    Example:
    Andrey - fix the notebook - 04/10/2013
    Andrey - check website - 06/10/2013
    Andrey - write the data to the flashdrive -10/10/2013
    Separator (as empty line that makes it easier to see when tasks from Andrey are finished and when the tasks from Boris have started)
    Boris - get…

    0 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Add option to repeating tasks due date to avoid weekends, holidays, i.e. workdays

    if due date is on a weekend, I must submit my status report on the last workday before then.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. Filter on tasks that do not contain certain text in the title

    Allow user to filter based on text within the Title.
    Example F:JB:Submit third quarter report
    P:Call accounting about duplicate invoice being submitted
    Being able to filter out tasks that have either "P:" or "F:" removes them from my list so I know what is Pending and who I need to follow up with on a delegated task.

    5 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. 744 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. 1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Turn missed calls into reminders

    Turn missed calls into reminders

    17 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. calendar integration - very disappointed that it dodsnt work-with blackberry playbook - sorry i bought ultimate to-do

    sorry I bought this software as it doesn't work with BB playbook calendar - not worth the money

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. 7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    under review  ·  1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 9 11 13 23 24
  • Don't see your idea?

New Feature Suggestions and Bug Reports

Categories

Feedback and Knowledge Base